Regression Modeling for Prediction of Earned Value Indexes in Public Building Construction Projects: The case of Ethiopia

open access: yesCogent Engineering, 2023
The construction industry is the sector involved with the repair of buildings and civil engineering structures in an economy. Public building construction projects are constructed repeatedly, and also it becomes difficult to complete projects in the ...
Genet Melkamu Ayalew   +2 more
doaj   +1 more source

Construction Project Monitoring: The Cost and Schedule Control by Earned Value Method (EVM)

open access: yesJournal of Technology Management and Business, 2021
On account of ever increasing complexities and uncertainties, construction project management has become more and more challenging day by day. As a result, continuous project monitoring emerges as a prime concern for the planned activities to be completed on schedule and within budget.
Rakibul Hasan   +2 more
openaire   +1 more source

Latent Errors and Visible Earned Value: How the Evolutionary Model Integrates Earned Value Metrics with Project System Dynamics

open access: yesSystems, 2021
A project model is presented that weaves together ideas from earned value project management and systems dynamics. It is able to adjust to increasingly unhealthy actual project behaviors in ways that preserve the signature pattern of the staffing ...
John M. Nevison, Karim J. Chichakly
doaj   +1 more source

An overview of recent research results and future research avenues using simulation studies in project management [PDF]

open access: yes, 2013
This paper gives an overview of three simulation studies in dynamic project scheduling integrating baseline scheduling with risk analysis and project control. This integration is known in the literature as dynamic scheduling.
Vanhoucke, Mario
core   +4 more sources

Earned Value Method untuk Analisis Pengendalian Jadwal dan Biaya pada sebuah Proyek Konstruksi Pump House

open access: yesJurnal Teknik Industri: Jurnal Hasil Penelitian dan Karya Ilmiah dalam Bidang Teknik Industri, 2022
Penelitian ini bertujuan untuk melakukan analisis pengendalian jadwal dan biaya pada konstruksi pump house C2BM5a. Penelitian dilakukan di PT Prasadha Pamunah Limbah Industri, sebuah industri penyedia jasa pengolahan limbah yang berlokasi di Desa Nambo ...
Salwa Nisrina, Muhammad Hisjam
doaj   +1 more source

A Guideline of Earned Value Method (EVM) Implementation as Decision Baseline on Acceleration Solutions for Construction Project Scheduling

open access: yesTechnium: Romanian Journal of Applied Sciences and Technology, 2023
Implementing an efficient performance monitoring system is necessary to complete a facility building project on time, on budget, and by established standards and specifications. Inappropriate system monitoring process could lead to project failures such as delay which commonly occurs.
null Zetta Rasullia Kamandang   +2 more
openaire   +1 more source

EARNED VALUE ANALYSIS, IMPLEMENTATION BARRIERS, AND MATURITY LEVEL IN OIL & GAS PRODUCTION

open access: yesSouth African Journal of Industrial Engineering, 2019
Poor performance measurement practices in the oil and gas industry can cause project cost overruns, schedule delays, and scope increases. Earned value management, as an integrated project planning and control method measuring cost and schedule ...
Zhan, Zhaoxi   +4 more
doaj   +1 more source

A Multi-stage Scheme Decision Model for Complex Products Based on Prospect Theory and Earned Value Method [PDF]

open access: yesSHS Web of Conferences, 2023
The development process of complex products is highly uncertain and risky, cause the balance among progress, cost and technology needs to be comprehensively considered.
Peng You, Wang Xiaoxin, Wu Yuheng
doaj   +1 more source

Application of Earned Value Method in Project Cost Management and Schedule Management

open access: yesProceedings of Business and Economic Studies, 2021
At present, with the rapid development of China’s economy, the development of the construction industry has made a new breakthrough. Project management requires the construction industry to continuously play its role and value in improving the ability of project management.
openaire   +2 more sources

Interpretation of Mathematical Model of Measurement of a Public Work Cost after Contractor Selection and before the Start of Contractual Activities

open access: yesBaltic Journal of Real Estate Economics and Construction Management, 2018
The manuscript focuses on the situation before the execution of construction activities starting and after the crystallization of the contractual object between Public Authority and contractor.
Metallinos Pavlos
doaj   +1 more source