Results 81 to 90 of about 1,249,401 (374)
Protein O‐glycosylation in the Bacteroidota phylum
Species of the Bacteroidota phylum exhibit a unique O‐glycosylation system. It modifies noncytoplasmic proteins on a specific amino acid motif with a shared glycan core but a species‐specific outer glycan. A locus of multiple glycosyltransferases responsible for the synthesis of the outer glycan has been identified.
Lonneke Hoffmanns +2 more
wiley +1 more source
Train Scheduling and Rescheduling in the UK with a Modified Shifting Bottleneck Procedure [PDF]
This paper introduces a modified shifting bottleneck approach to solve train scheduling and rescheduling problems. The problem is formulated as a job shop scheduling model and a mixed integer linear programming model is also presented.
Bennell, Julia A. +2 more
core +1 more source
Microfluidic electro‐viscoelastic manipulation of extracellular vesicles
The electro‐viscoelastic manipulation as a potential method for separation of particles based on size. The particles introduced as a sheath flow migrate to the channel center under the influence of simultaneously applied electric field and pressure driven flow.
Seyedamirhosein Abdorahimzadeh +7 more
wiley +1 more source
Two‐way inhibition of PAX5 transcriptional activity by PAX5::CBFA2T3
PAX5::CBFA2T3 (PAX5‐C) is a fusion protein of the B‐cell transcription factor, PAX5, and is found in B‐cell ALL. We propose a putative model of two‐way inhibition of PAX5 transcriptional activity by PAX5‐C. There are two ways of repression by PAX5‐C: DNA‐binding‐dependent way and HDAC‐dependent way, with either being sufficient for the repression. HDAC
Reina Ueno +12 more
wiley +1 more source
PEMAKAIAN ALGORITMA GENETIK UNTUK PENJADWALAN JOB SHOP DINAMIS NON DETERMINISTIK
Dynamic Job shops non deterministic scheduling problem is concerned with ordering some operations that processed by certain machines with variable and unknown arrival time of jobs. When new jobs arrive, it requires modifications in the existing schedule.
Nico Saputro, Yento Yento
doaj
This paper develops job shop production scheduling using Non Delay algorithm through forward and backward-forward algorithm to minimize total earliness and tardiness costs.
Dian Retno Sari Dewi
doaj +1 more source
Does Order Negotiation Improve The Job-Shop Workload Control? [PDF]
Work flows in a job-shop are determined not only by the release load and the time between release factors, but also by the number of accepted orders.
M. Rosário Moreira, Rui Alves
core
An improved adaptive neural network for job-shop scheduling [PDF]
This article is posted here with permission of IEEE - Copyright @ 2005 IEEEJob-shop scheduling is one of the most difficult production scheduling problems in industry.
Yang, S
core +3 more sources
This study presents a novel approach to teaching Python and bioinformatics using team‐based learning and cloud‐hosted notebooks. By integrating interactive coding into biomedical education, the method improves accessibility, student engagement, and confidence—especially for those without a computing background.
Nuno S. Osório, Leonardo D. Garma
wiley +1 more source
job shop scheduling problem:literature review
As an extension of the Job Shop Scheduling (JSP), Flexible job-shop Scheduling Problem (FJSP), can be defined as one of the most significant problems in up-to-date manufacturing systems, recently a lot of studies have been conducted to address FJSP ...
Marrwa Abd-AlKareem Alabajee +2 more
doaj +1 more source

