Results 101 to 110 of about 290,577 (296)

COMP–PMEPA1 axis promotes epithelial‐to‐mesenchymal transition in breast cancer cells

open access: yesMolecular Oncology, EarlyView.
This study reveals that cartilage oligomeric matrix protein (COMP) promotes epithelial‐to‐mesenchymal transition (EMT) in breast cancer. We identify PMEPA1 (protein TMEPAI) as a novel COMP‐binding partner that mediates EMT via binding to the TSP domains of COMP, establishing the COMP–PMEPA1 axis as a key EMT driver in breast cancer.
Konstantinos S. Papadakos   +6 more
wiley   +1 more source

Construction in Imperial Rome: organisation, logistics, and daily life on building sites

open access: yesArqueología de la Arquitectura
This article investigates the phenomenon of the building site in ancient Rome, drawing on ancient literary sources, legal texts, as well as epigraphic, iconographic, and archaeological evidence.
Fabrizio Sommaini
doaj   +1 more source

Value-based modelling: an Australian case of off-site manufactured buildings

open access: yes, 2018
Benefits to the construction industry through the use of off-site manufactured (OSM) buildings are well documented. However, and like most innovations, the uptake of OSM has been rather slow.
Sahin, Oz, Mohamed, Sherif, Miller, Dane
core   +1 more source

Engineered extracellular vesicles enriched with the miR‐214/199a cluster enhance the efficacy of chemotherapy in ovarian cancer

open access: yesMolecular Oncology, EarlyView.
Loss of the miR‐214/199a cluster is associated with recurrence in ovarian cancer. Engineered small extracellular vesicles (m214‐sEVs) elevate miR‐214‐3p/miR‐199a‐5p in tumor cells, suppress β‐catenin, TLR4, and YKT6 signaling, reprogram tumor‐derived sEV cargo, reduce chemoresistance and migration, and enhance carboplatin efficacy and survival in ...
Weida Wang   +12 more
wiley   +1 more source

A Research Roadmap for Off-Site Construction: Automation and Robotics

open access: yes, 2019
The development of a research roadmap was undertaken to further the activities of a joint industry-university-government initiative in off-site construction research in Canada.
Rankin, Jeff, Bowmaster, Jeremy
core   +1 more source

Somatic mutational landscape in von Hippel–Lindau familial hemangioblastoma

open access: yesMolecular Oncology, EarlyView.
The causes of central nervous system (CNS) hemangioblastoma in Von Hippel–Lindau (vHL) disease are unclear. We used Whole Exome Sequencing (WES) on familial hemangioblastoma to investigate events that underlie tumor development. Our findings suggest that VHL loss creates a permissive environment for tumor formation, while additional alterations ...
Maja Dembic   +5 more
wiley   +1 more source

Defects in off-site construction : timber module prefabrication

open access: yes, 2009
The construction industry is based on craftsmanship. Quality control and assurance procedures applied in manufacturing cannot usually be readily applied in construction, where there are higher degrees of uniqueness in each project.
Meiling, John,, Johnsson, Helena,
core   +1 more source

Establishment of a humanized patient‐derived xenograft mouse model of high‐grade serous ovarian cancer for preclinical evaluation of combination immunotherapy

open access: yesMolecular Oncology, EarlyView.
We have established a humanized orthotopic patient‐derived xenograft (Hu‐oPDX) mouse model of high‐grade serous ovarian cancer (HGSOC) that recapitulates human tumor–immune interactions. Using combined anti‐PD‐L1/anti‐CD73 immunotherapy, we demonstrate the model's improved biological relevance and enhanced translational value for preclinical ...
Luka Tandaric   +10 more
wiley   +1 more source

Strengthening Sustainability Rating Credit for Off-Site Construction

open access: yesModular and Offsite Construction (MOC) Summit Proceedings, 2016
Off-site construction has inherent advantages over conventional construction in terms of sustainability that extend well beyond lower construction site waste, yet the common building sustainability rating systems in the U.S. and Canada provide little or no credits to reflect prefabricationäó»s sustainability-promoting characteristics. As project owners
openaire   +2 more sources

Barriers and drivers for increased use of off-site bridge construction in Sweden

open access: yes, 2012
There is great pressure to change the civil engineering industry in Sweden, which is said not to follow efficiency growth other manufacturing sectors are achieving.
Larsson, Johan, Simonsson, Peter
core  

Home - About - Disclaimer - Privacy