Results 91 to 100 of about 5,243 (170)
Increasing the speed of a pantograph deteriorates its aerodynamic performance and aggravates the problem of flow-induced vibration, which is not conducive to the stability of the pantograph – catenary system (PCS). Currently, commercial high-speed trains
Zhuojun Li +6 more
doaj +1 more source
Optimal Control of Pantograph-Catenary Systems Using MatLab
This paper continues research of the pantograph-catenary system started in previous papers [1,2] and presented in the First International Conference on Railway Technology [3] .
Matvejevs, Aleksandrs +1 more
core
Numerical study on pantograph raising and lowering in multi-pantograph operation
Multi-pantograph operation is a convenient and efficient way to operate railway rolling stock, but the influence between the pantographs makes the system more sensitive and vulnerable than a single-pantograph system.
Rønnquist, Anders +2 more
core
Optimal Control of Pantograph-Catenary System Based on Parametric Identification
This article continues research on the pantograph-catenary system started in the previous papers [1], [2]. The main purpose of the study is to use a computer of high-speed train to optimize the pantograph-catenary system by reducing power consumption ...
Matvejevs, Aleksandrs +1 more
core
Impact of the velocity of a pantograph traversing along the catenary on the pantograph - catenary system [PDF]
W pracy przedstawiono zagadnienie modelowania układu drgającego odbierak prądu –sieć trakcyjna jako modelu fizycznego z masą skupioną sieci trakcyjnej. Do celów symulacyjnych spośród wielu istniejących modeli pantografów wybrano model WBL 85 3 kV, który ...
Jagiełło, A. S., Dudzik, M.
core
Fatigue analysis of catenary contact wires for high speed trains [PDF]
The fatigue fracture is one of the most critical failures which may occur on the high speed network because it is undetectable and it has a huge impact on traffic disruption.
MAITOURNAM, Habibou +4 more
core
Study on Applicability of V500 High-speed Pantograph Models
To analyze applicability of pantograph models, dynamic parameter identifying was implemented for domestic independentdevelopedV500 high-speed pantograph prototype, and pantograph two-lumped-mass model and three-lumped-mass model kinetic parameterwere ...
ZHONG Wei-guang +2 more
doaj
The Image Detection of Pantograph Slide Based on Yang-shot Mode
At present, most of the pantograph slide images based on the image processing to detect slide wear are obtained by using overhead mode, but this way has some limitations for some complex arched.
师鹏燕 +4 more
doaj
The continuous movement of high-speed train results in the pantograph interacting with a long catenary structure. The traditional methods based on the Lagrangian description can only model the whole long catenary structure, which decreases their ...
Lei, Jilin, +5 more
core +1 more source
A Non-Intrusive Monitoring System on Train Pantographs for the Maintenance of Overhead Contact Lines. [PDF]
Rodríguez-Arana B +3 more
europepmc +1 more source

