Results 101 to 110 of about 13,456 (268)
Almost Surely Asymptotic Stability of Exact and Numerical Solutions for Neutral Stochastic Pantograph Equations [PDF]
Zhanhua Yu
openalex +1 more source
With the rapid development of high-speed railways, the dynamic performance of the pantograph–catenary system plays a crucial role in ensuring the safe and stable operation of trains.
Tong Xing +5 more
doaj +1 more source
Pantograph and Catenary Arc under Stiff Contact Wires of 120 km/h Metro Vehicles
Aiming at the 120 km/h vehicles pantograph and catenary arc of Guangzhou metro line 3 north-extension section, thearc generation cause was analyzed, and the pantograph and catenary model was built. With the simulation from the pantograph and thecatenary,
ZHOU Dalin, GAO Wei, ZHENG Xuan
doaj
EMISSIONS OF VOLTAGE ON THE PANTOGRAPH OF AN ELECTRIC LOCOMOTIVE DE1
Т. М. Мищенко
openalex +2 more sources
Kinematics Analysis for High-speed Pantograph
Function and structure of the high-speed pantograph used on the CRH380CL were introduced. This paper put emphasis onthe kinematics of the pantograph. A motion model of the pantograph was built.
GUO Gui-lin, WANG Jun-yong
doaj
Failure Analysis and Structural Optimization for Elastic Element of High-speed Pantograph
The elastic element of high-speed pantograph is used to relieve the shock and vibration between pantograph and catenary to ensure the dynamic current collection of pantograph head is stable and reliable.
Yingyu YANG, Congjian JIANG, Jiejun LYU
doaj
Increasing the speed of a pantograph deteriorates its aerodynamic performance and aggravates the problem of flow-induced vibration, which is not conducive to the stability of the pantograph – catenary system (PCS). Currently, commercial high-speed trains
Zhuojun Li +6 more
doaj +1 more source
A Sigma-Points Kalman Filter Based Estimation for Railway Pantograph Contact Force Monitoring [PDF]
Salvatore Strano +2 more
openalex +1 more source

