Results 11 to 20 of about 4,032 (228)

A Numerical Study on Pantograph Raising and Lowering in Multi-Pantograph Operation

open access: yesInternational Journal of Railway Technology, 2017
Multi-pantograph operation allows several short electric multiple unit (EMU) trainsets to be coupled or decoupled to adapt to daily or seasonal passenger-flow variation. Although this is a convenient and efficient way to operate rolling stock and use railway infrastructure, pantographs significantly influence each other and even significantly change ...
Liu, Zhendong   +2 more
openaire   +3 more sources

Study on abnormal abrasion of metro pantograph

open access: yes机车电传动, 2023
Pantograph-catenary system is the central system for the power supply of urban rail transit trains. Higher train speed and complex train operating environment can generate severe vibrations on the pantograph-catenary system, resulting in high-frequency ...
ZHANG Shiyu   +4 more
doaj   +2 more sources

Kinematics Analysis for High-speed Pantograph

open access: yes机车电传动, 2013
Function and structure of the high-speed pantograph used on the CRH380CL were introduced. This paper put emphasis onthe kinematics of the pantograph. A motion model of the pantograph was built.
GUO Gui-lin, WANG Jun-yong
doaj   +2 more sources

Pantograph catenary dynamic optimisation based on advanced multibody and finite element co-simulation tools [PDF]

open access: yes, 2013
This paper presents recent developments undertaken by the SNCF Innovation & Research Department on numerical modelling of pantograph catenary interaction. It aims at describing an efficient co-simulation process between finite element (FE) and multibody (
BALMES, Etienne   +4 more
core   +1 more source

Approximate solutions of hybrid stochastic pantograph equations with Levy jumps [PDF]

open access: yes, 2013
We investigate a class of stochastic pantograph differential equations with Markovian switching and Levy jumps. We prove that the approximate solutions converge to the true solutions in 퐿 2 sense as well as in probability under local Lipschitz condition ...
Mao, Wei   +3 more
core   +1 more source

Adaptive and Robust Fault-Tolerant Tracking Control of Contact force of Pantograph-Catenary for High-Speed Trains [PDF]

open access: yes, 2015
This paper presents a modified multi-body dynamic model and a linear time-invariant model with actuator faults (loss of effectiveness faults, bias faults) and matched and unmatched uncertainties.
Yan, Xinggang   +3 more
core   +1 more source

Research on the Influence of Straddle-Type Monorail’s Pantograph Head Parameter on Power Collection Quality

open access: yesUrban Rail Transit, 2017
At present, the coupling relationship between the pantograph and catenary is not ideal for straddle-type monorail. The power collection quality is poor, and the wear of the contact strip of a pantograph is uneven.
Zhen Yang   +4 more
doaj   +1 more source

Research on Control of Short EMU Reconnection Passing Neutral Section

open access: yes机车电传动, 2021
In order to solve the problem that the reconnection of CRH6F-A/CRH6A-A short intercity EMU can not meet the requirements of the length of neutral section of domestic lines, the reconnection control method of short intercity EMU was studied,and the ...
Wantao XU   +4 more
doaj  

Analysis of Pantograph Key Parameters Suitable for 200 km/h Train Overhead Rigid Catenary

open access: yesChengshi guidao jiaotong yanjiu
Objective The compatibility between the ORC (overhead rigid catenary) and the pantograph directly affects the current collection performance of the PC (pantograph-catenary) system.
TIAN Cai, FENG Chao, DAI Hongyu
doaj   +1 more source

Estimator-based H∞ control considering actuator time delay for active double-pantograph in high-speed railways

open access: yesJournal of Low Frequency Noise, Vibration and Active Control, 2021
When two electric multiple units are non-electrically connected together for improving the transport capacity in high-speed railways, double pantographs frequently operate simultaneously to decrease the current capacity on a single pantograph collector ...
Xiaobing Lu   +5 more
doaj   +1 more source

Home - About - Disclaimer - Privacy