Results 21 to 30 of about 12,628 (213)
Application of GWO-SVM Algorithm in Arc Detection of Pantograph
High-speed train will produce pantograph arc during the driving process, which is harmful to pantograph-catenary system. In order to reduce pantograph-catenary system damage, a method based on Gray Wolf algorithm to optimize the binary Support Vector ...
Bin Li, Chenyu Luo, Zhiyong Wang
doaj +1 more source
Simulation and Verification of Effect of Arc Duration on Arc Temperature Based on COMSOL
The pantograph–catenary arc of urban rail has the characteristic of high temperature, which directly acts on the surface of the pantograph–catenary system, will seriously ablate pantograph and contact line, and affect the flow of the pantograph–catenary ...
Xiaoying Yu, Mengjie Song, Ze Wang
doaj +1 more source
Pantograph catenary dynamic optimisation based on advanced multibody and finite element co-simulation tools [PDF]
This paper presents recent developments undertaken by the SNCF Innovation & Research Department on numerical modelling of pantograph catenary interaction. It aims at describing an efficient co-simulation process between finite element (FE) and multibody (
BALMES, Etienne +4 more
core +1 more source
Stability analysis of pantograph under frictional force
The frictional force acts to the travelling pantograph head in horizontal direction due to sliding of the pantograph head and contact wire. Therefore, vertical motion of the pantograph head is generated by link mechanism of the pantograph.
Shigeyuki KOBAYASHI +2 more
doaj +1 more source
Improving the on-line detection level of pantograph-catenary system and evaluating its service status has become a key problem to be solved in the construction of intelligent operation and maintenance of heavy-haul locomotive.
Jiejun LYU, Hongjun HE, Congjian JIANG
doaj
Adaptive and Robust Fault-Tolerant Tracking Control of Contact force of Pantograph-Catenary for High-Speed Trains [PDF]
This paper presents a modified multi-body dynamic model and a linear time-invariant model with actuator faults (loss of effectiveness faults, bias faults) and matched and unmatched uncertainties.
Yan, Xinggang +3 more
core +1 more source
At present, the coupling relationship between the pantograph and catenary is not ideal for straddle-type monorail. The power collection quality is poor, and the wear of the contact strip of a pantograph is uneven.
Zhen Yang +4 more
doaj +1 more source
3D Liquid Crystal Framework Enclosing Dual Compartments
A new type of liquid crystal phase is reported, having the conjugated rod‐like molecular cores form a 3D framework of elongated octahedral cages filled alternatively with alkyl and fluoroalkyl pendant chains. The cages are held together by flexible H‐bonding hinges, making them adaptable to thermal expansion and stable in a wide temperature range.
Yang‐yang Zhao +7 more
wiley +2 more sources
The numerical tools can be used to facilitate the design of the railway pantograph-catenary system. The validation of the current numerical results is mostly performed at a speed slower than 350 km/h. This paper aims at the validation and analysis of the
Jia Yang +5 more
doaj +1 more source
Analysis of Pantograph Key Parameters Suitable for 200 km/h Train Overhead Rigid Catenary
Objective The compatibility between the ORC (overhead rigid catenary) and the pantograph directly affects the current collection performance of the PC (pantograph-catenary) system.
TIAN Cai, FENG Chao, DAI Hongyu
doaj +1 more source

