Resource-constrained project scheduling for timely project completion with stochastic activity durations. [PDF]

open access: yes
We investigate resource-constrained project scheduling with stochastic activity durations. Various objective functions related to timely project completion are examined, as well as the correlation between these objectives. We develop a GRASP-heuristic to
Leus, Roel, Ballestin, F.
core  

INTEGRATING RISK MANAGEMENT INTO PROJECT SCHEDULING: A CRITICAL PATH METHOD APPROACH IN COAL MINING DEVELOPMENT PROJECT

open access: yesIndonesian Interdisciplinary Journal of Sharia Economics
This study analyses the integration of risk management into project scheduling in a coal mining development project. A mixed-methods case study was applied, combining interviews, observations, document analysis, and structured questionnaires.
Bayu Setiyawan, Siti Nursyamsiah
doaj   +1 more source

Analisis Tingkat Kepuasan Konsumen terhadap Pelayanan Bongkar-Muat Barang pada Terminal Petikemas Semarang

open access: yesMedia Komunikasi Teknik Sipil, 2015
This study aims to analyze the level of consumer expectations and service performance and user satisfaction level loading service at Semarang Container Terminal.
Yoeli Janto
doaj   +1 more source

Emerging experimental and computational methods for studying redox‐regulated structural transitions

open access: yesFEBS Letters, EarlyView.
Redox reactions can reshape proteins and alter how they behave in cells, with important consequences for health and disease. This review explores emerging experimental and computational approaches for discovering these redox‐sensitive protein switches, revealing their structural effects, and predicting their behavior, opening new opportunities to ...
Tasneem Rass   +2 more
wiley   +1 more source

Phase transitions in project scheduling. [PDF]

open access: yes
The analysis of the complexity of combinatorial optimization problems has led to the distinction between problems which are solvable in a polynomially bounded amount of time (classified in P) and problems which are not (classified in NP).
De Reyck, B, Herroelen, Willy
core  

Scheduling of Empennage Structure Design Project of Indonesia’s Aircraft with Critical Path Method (CPM)

open access: yesMATEC Web of Conferences, 2018
Production of the aircraft becomes very important to facilitate many passengers of aircraft in Indonesia in the future. The design of a very complex aircraft requires proper project management.
Wulandari Arin, Dachyar M., Farizal
doaj   +1 more source

Translophagy—A potential link between autophagy impairment and translational errors

open access: yesFEBS Letters, EarlyView.
Neurodegenerative diseases are characterised by the accumulation of abnormal proteins and protein aggregates, but their origin often remains unknown. We propose that selective autophagy removes damaged protein‐making machinery, preventing errors during protein synthesis.
Mykola V. Korolchuk   +11 more
wiley   +1 more source

CONTRIBUTIONS TO MULTI-AGENT SYSTEMS IMPLEMENTATION FOR PROJECT SCHEDULING [PDF]

open access: yes
Increasing project complexity makes scheduling problems more difficult to solve and requires more versatile algorithms. Two different approaches for the project scheduling optimization could be considered: TCPSP (Time-Constrained Project Scheduling), and
Ileana Ruxandra BADEA   +1 more
core  

An exact procedure for the resource-constrained weighted earliness-tardiness project scheduling problem. [PDF]

open access: yes
In this paper we study the resource-constrained project scheduling problem with weighted earliness-tardinesss penalty costs. Project activities are assumed to have a known deterministic due date, a unit earliness as well as a unit tardiness penalty cost ...
Vanhoucke, Mario   +2 more
core   +2 more sources