Results 121 to 130 of about 416,644 (266)

Simultaneous Enhancement of Performance and Stability in Dual‐Gate a‐IGZO Thin‐Film Transistors via Single‐Step Laser Annealing for Capacitor‐Less DRAM

open access: yesAdvanced Functional Materials, EarlyView.
A single‐step laser annealing strategy is presented for dual‐gate a‐IGZO TFTs. The steep thermal gradient induces graded oxygen doping in the channel and simultaneous WOx removal at the contacts, enabling concurrent interface and contact engineering.
Sihyeon Kwon   +9 more
wiley   +1 more source

Functionalizing Micro‐to‐Mesoscopic Electrode Architectures for Regulating Electron Transfer Behaviors in Electrocatalysis

open access: yesAdvanced Functional Materials, EarlyView.
A systematic review is conducted to assess the influence of electrode architecture across micro‐ to mesoscopic length scales on electron‐transfer pathways in electrocatalysis. We discuss the structure‐activity relationships in electrocatalytic applications, including resource recovery and environmental remediation, and provide cost‐effective, efficient
Manshu Zhao   +6 more
wiley   +1 more source

Noise‐Limited Bit Precision in Ferroelectric Synaptic Transistors for High‐Resolution Neuromorphic Computing

open access: yesAdvanced Functional Materials, EarlyView.
Low‐frequency noise spectroscopy defines the resolvable conductance states of synaptic FeFETs by coupling read‐current fluctuation with usable dynamic range. The resulting noise‐limited bit precision establishes a universal, device‐agnostic reliability metric beyond the memory window, enabling quantitative benchmarking and rational design of high ...
Jaehong Park   +12 more
wiley   +1 more source

An Edible Chitosan‐Based Acoustic Sensor for Sound‐Responsive Actuation in Edible Robots

open access: yesAdvanced Functional Materials, EarlyView.
This study introduces an edible acoustic sensor for robotic food and edible robotics. Built from a chitosan piezoelectric film between gold electrodes, the sensor enables acoustic communication through ON/OFF keying. Integrated into an edible robot with pneumatically actuated arms and neck, it responds to high‐frequency tones.
Valerio Francesco Annese   +8 more
wiley   +1 more source

Coordinated Architectural and Chemical Reinforcement in the Crushing Mandible of a Soldier Termite

open access: yesAdvanced Functional Materials, EarlyView.
The crushing mandible of a soldier termite withstands substantial biting loads despite lacking mineral. Its cuticle is partitioned: convex teeth pair hardness and zinc enrichment with aligned chitin fibers for contact durability, while stiffer concave regions between teeth carry bending loads.
Andrew Tran Nguyen   +16 more
wiley   +1 more source

Memristive‐Gated RC‐Delay Synaptic Transistors for Time‐Encoded Analog in‐Memory Computing

open access: yesAdvanced Functional Materials, EarlyView.
A Memristive‐Gated Transistor for Time‐Encoded Analog In‐Memory Computing — By exploiting the RC delay of a self‐rectifying interface‐type memristor, nonlinear I–V distortion is structurally bypassed, enabling 3‐bit nonvolatile memory, spike‐timing‐based analog encoding, and hardware‐calibrated reservoir‐computing validation within a unified device ...
Yun‐Seo Shin   +7 more
wiley   +1 more source

Balancing Hydrophobicity and Hydrophilicity: Dual Filler‐Engineered Proton Exchange Membranes for Durable, High‐Power Fuel Cells

open access: yesAdvanced Functional Materials, EarlyView.
Polarity‐matched Zr–MOFs program Nafion's nanoscale morphology during solution casting. Hydrophilic UiO‐66 preserves hydrated pathways, while hydrophobic UiO‐67 increases the proton hopping sites by densifying ionic clusters. Combining both fillers yields a membrane that delivers 176 mS cm−1 conductivity, reaches 1.46 W cm−2 under 200 kPa, and triples ...
Yonghwi Cho   +13 more
wiley   +1 more source

Gradient‐Conductivity Architecture Enables Synchronous Enhancement of Sensitivity and Detection Range in Multifunctional All‐Paper Sensors

open access: yesAdvanced Functional Materials, EarlyView.
A gradient‐engineered all‐paper sensor is fabricated by integrating MXene and in situ grown AgNPs within hierarchical cellulose networks. The device breaks the sensitivity–detection range trade‐off through cascaded conductive pathways, enabling ultrahigh pressure sensitivity, humidity–pressure decoupled dual‐mode sensing, and outstanding EMI shielding,
Ao Li   +7 more
wiley   +1 more source

Emerging Post‐CMOS Hardware Neurons for Brain‐Inspired Computing: Devices, Circuits, and System Integration

open access: yesAdvanced Functional Materials, EarlyView.
The physical realization of artificial neurons is a critical challenge for energy‐efficient neuromorphic computing. This review presents a comprehensive analysis of the evolution of artificial neuron implementations from conventional CMOS to emerging post‐CMOS technologies.
Kannan Udaya Mohanan   +4 more
wiley   +1 more source

Home - About - Disclaimer - Privacy