Results 141 to 150 of about 416,644 (266)

Advances in Solution‐Processed Textile Triboelectric Nanogenerators: Ink Formation, Processing Strategies, Applications, and Challenges

open access: yesAdvanced Functional Materials, EarlyView.
Advanced ink systems for solution‐processed textile triboelectric nanogenerators are systematically summarized, spanning conductive, tribo‐negative, and tribo‐positive layers. By connecting ink chemistry, deposition methods, and device function, the present review reveals the key governing principles of solution development and highlights practical ...
Xinlong Sun, Stephen Beeby
wiley   +1 more source

Embedded Direct Ink Writing of Thermoset and Elastomeric Polymers via Frontal Polymerization

open access: yesAdvanced Functional Materials, EarlyView.
Embedded frontal polymerization direct ink writing (FP‐DIW) combines frontal ring‐opening metathesis polymerization with embedded 3D printing to decouple deposition from curing. A yield‐stress support bath stabilizes low‐viscosity inks, while on‐demand thermal initiation enables controlled front propagation. This approach expands the accessible feature
Mohammad Tanver Hossain   +12 more
wiley   +1 more source

Designing Vanadium‐Based Oxide Electrocatalysts for Water Splitting: Experimental and Mechanistic Insights with Machine Learning

open access: yesAdvanced Functional Materials, EarlyView.
This review establishes structure‐property‐mechanism relationships across six modification strategies for V‐based oxide water‐splitting electrocatalysts: lattice engineering, heteroatom doping, interface engineering, carbon‐based hybridization, morphology engineering, and surface reconstruction and pre‐catalyst design, where dissolution is reframed as ...
Youness El Issmaeli   +4 more
wiley   +1 more source

Upcycling Keratin‐Based Textile Waste Into High‐Performance Hybrid Fibers Via Tuning the Interfacial Interactions

open access: yesAdvanced Functional Materials, EarlyView.
Keratin recovered from animal‐hair textile waste is fractionated and blended with cellulose to produce continuously spun hybrid fibers. Selecting the high‐molecular‐weight keratin fraction enables 30 wt.% keratin incorporation while maintaining high strength in dry and wet states.
Mian Zhai   +6 more
wiley   +1 more source

Parallelizing the Critical Path

open access: yes, 2016
For many parallel matrix computations the execution time is determinedby the length of the critical path. The baseline approach used to reduce the execution time is to adjust the task granularity. If the tasks are made smaller, the length of the critical path will decrease and by extension reduce the execution time for the computation.
openaire   +1 more source

Rapid Microwave Plasma Engineering of HfO2/C@C Core‐Shell Fibrous Membrane Toward Flexible High‐Performance Electromagnetic Wave Absorption

open access: yesAdvanced Functional Materials, EarlyView.
Rapid microwave plasma torch engineering tunes crystal phases, carbon graphitization and oxygen‐vacancy defects in HfO2/C@C core‐shell fibrous membranes. Synergistic multi‐loss effects optimize impedance matching to deliver −65.75 dB reflection loss and a 7.37 GHz effective bandwidth for flexible electromagnetic wave absorption.
Qichao Ding   +14 more
wiley   +1 more source

Home - About - Disclaimer - Privacy