Results 221 to 230 of about 416,644 (266)
Some of the next articles are maybe not open access.
A Novel Algorithm for Critical Paths
2009 WRI World Congress on Computer Science and Information Engineering, 2009The problem of finding all the critical paths is a mathematics based algorithm for scheduling a set of project activities. A new algorithm to find all the critical paths for an AOE Network is presented in this paper. With this algorithm, topological inverted sequence scanning is not required again. A predecessors list is designed for each event node to
openaire +2 more sources
The Gantt chart on Elena’s wall was twenty feet long, a sprawling digital tapestry of blue, yellow, and red bars. But Elena only saw the red.
openaire +2 more sources
openaire +2 more sources
AORN Journal, 1991
Since January 1990, surgeons have been able to make their incision within 15 minutes of the scheduled time. Total joint procedures, craniotomies, open heart surgery, and thoracic surgeries have had incision times within 15 minutes of the critical path timetable. Daily analysis of activity is done by reviewing the time study. The monthly delay report is
openaire +2 more sources
Since January 1990, surgeons have been able to make their incision within 15 minutes of the scheduled time. Total joint procedures, craniotomies, open heart surgery, and thoracic surgeries have had incision times within 15 minutes of the critical path timetable. Daily analysis of activity is done by reviewing the time study. The monthly delay report is
openaire +2 more sources
CP-PGWO: multi-objective workflow scheduling for cloud computing using critical path
Cluster Computing, 2021Seyed Morteza Babamir, Saeed Doostali
exaly
GPU-accelerated Critical Path Generation with Path Constraints
2021 IEEE/ACM International Conference On Computer Aided Design (ICCAD), 2021Guannan Guo +3 more
openaire +1 more source
PSO based test case generation for critical path using improved combined fitness function
Journal of King Saud University - Computer and Information Sciences, 2020Mitrabinda Ray
exaly
Critical care of patients with cancer
Ca-A Cancer Journal for Clinicians, 2016Alexander Shimabukuro-Vornhagen +2 more
exaly
Paths and Circuits in Critical Graphs
American Journal of Mathematics, 1954Kelly, John B., Kelly, L. M.
openaire +2 more sources

