Results 231 to 240 of about 416,644 (266)
Some of the next articles are maybe not open access.

A simple approach to fuzzy critical path analysis in project networks

Applied Mathematical Modelling, 2008
Shih-Pin Chen
exaly  

Path sensitization in critical path problem (logic circuit design)

IEEE Transactions on Computer-Aided Design of Integrated Circuits and Systems, 1993
D H -C Du, H -C Chen
exaly  

Evaluation of the Resource-Constrained Critical Path Method Algorithms

Journal of Construction Engineering and Management - ASCE, 2005
Jesus M de la Garza   +2 more
exaly  

Critical path identification in the context of a workflow

Information and Software Technology, 2002
Myoung Ho Kim
exaly  

Resource-Activity Critical-Path Method for Construction Planning

Journal of Construction Engineering and Management - ASCE, 2003
Heng Li, Ming Lu
exaly  

Analysis of critical paths in a project network with fuzzy activity times

European Journal of Operational Research, 2007
Shih-Pin Chen
exaly  

Home - About - Disclaimer - Privacy