Results 21 to 30 of about 140,910 (288)

Cognitive abilities and superior decision making under risk: A protocol analysis and process model evaluation

open access: yesJudgment and Decision Making, 2009
Individual differences in cognitive abilities and skills can predict normatively superior and logically consistent judgments and decisions. The current experiment investigates the processes that mediate individual differences in risky choices.
Edward T. Cokely, Colleen M. Kelley
doaj   +1 more source

Coordination of several robots based on temporal synchronization [PDF]

open access: yes, 2016
© 2016. This manuscript version is made available under the CC-BY-NC-ND 4.0 license http://creativecommons.org/licenses/by-nc-nd/4.0/This paper proposes an approach to deal with the problem of coordinating multi-robot systems, in which each robot ...
Montaño Sarria, Andrés Felipe   +1 more
core   +2 more sources

Testing Process Predictions of Models of Risky Choice: A Quantitative Model Comparison Approach

open access: yesFrontiers in Psychology, 2013
This article presents a quantitative model comparison contrasting the process predictions of two prominent views on risky choice. One view assumes a trade-off between probabilities and outcomes (or nonlinear functions thereof) and the separate evaluation
Thorsten ePachur   +3 more
doaj   +1 more source

Analysis of dispatching rules application on scheduling problem in flexible-flow shop production [PDF]

open access: yesTehnika, 2014
In this paper we analyzed a group of simple heuristic methods, which are used for solving the scheduling problem in manufacturing and services. The analysis was performed on the scheduling problem in a flexible-flow shop production, which is known by the
Rakićević Zoran M.   +1 more
doaj   +1 more source

A Multi-PR Heuristic for Distributed Multi-Project Scheduling With Uncertain Duration

open access: yesIEEE Access, 2020
Multiple projects are often managed and run in a decentralized setting. In this paper, considering the uncertainty in project implementation, we study the distributed multi-project scheduling problem with uncertain duration.
Dongning Liu, Zhe Xu
doaj   +1 more source

A scheduling theory framework for GPU tasks efficient execution [PDF]

open access: yes, 2018
Concurrent execution of tasks in GPUs can reduce the computation time of a workload by overlapping data transfer and execution commands.
A Allahverdi   +11 more
core   +2 more sources

Operating Room Scheduling Considering Patient Priorities and Operating Room Preferences: A Case Study [PDF]

open access: yesInternational Journal of Industrial Engineering and Production Research, 2022
Operating rooms have become the most important areas in hospitals because of the scarcity and cost of resources. The present study investigates operating room scheduling and rescheduling considering the priority of surgical patients in a specialized ...
Sima Boosaiedi   +2 more
doaj  

An improved performance of greedy heuristic solutions for a bi-criteria mixture packaging problem of two types of items with bounded weights

open access: yesJournal of Advanced Mechanical Design, Systems, and Manufacturing, 2020
In this paper, we treat a lexicographic bi-criteria combinatorial optimization model of mixture packaging of two types of items, which arises in actual food packing systems, so-called multi-head weighers.
Yoshiyuki KARUNO, Oki NAKAHAMA
doaj   +1 more source

A Novel Priority Rule Heuristic: Learning from Justification

open access: yesProceedings of the International Conference on Automated Planning and Scheduling, 2014
The Resource Constrained Project Scheduling Problem consists of finding start times for precedence-constrained activities which compete over renewable resources, with the goal to produce the shortest schedule. The method of Justification is a very popular post-processing schedule optimization technique which, although it is not clear ...
Nijs, Frits de, Klos, Tomas
openaire   +2 more sources

A novel heuristic method for flexible job-shop scheduling problem with sequence-dependent setup time, transportation time and machine efficiency constraints [PDF]

open access: yesArchives of Control Sciences
This paper presents a novel heuristic approach to the Flexible Job-Shop Scheduling Problem (FJSP), incorporating sequence-dependent setup and transportation times, as well as machine efficiency constraints.
Jolanta Krystek, Adam Geppert
doaj   +1 more source

Home - About - Disclaimer - Privacy