A novel heuristic method for flexible job-shop scheduling problem with sequence-dependent setup time, transportation time and machine efficiency constraints [PDF]
This paper presents a novel heuristic approach to the Flexible Job-Shop Scheduling Problem (FJSP), incorporating sequence-dependent setup and transportation times, as well as machine efficiency constraints.
Jolanta Krystek, Adam Geppert
doaj +1 more source
In this paper, we treat a lexicographic bi-criteria combinatorial optimization model of mixture packaging of two types of items, which arises in actual food packing systems, so-called multi-head weighers.
Yoshiyuki KARUNO, Oki NAKAHAMA
doaj +1 more source
Testing the Priority Heuristic Using Matching and Choice Tasks
According to the priority heuristic (Brandstätter et al., 2006), people choose between two risky, non-negative gambles by examining reasons in the following order: the minimum gains, their probabilities, and the maximum gains. The aim of this study is to
Janina Grill, Eduard Brandstätter
core +1 more source
Improve Algoritma Hodgson Untuk Meminimasi Jumlah Job Terlambat Pada Penjadwalan Flow shop
Since Johnson published a paper in 1954, the problem of job scheduling has received the attention of hundreds of practitioners and researchers, as one of the most studied topics in Operation research.
Dian Setiya Widodo
doaj +1 more source
Solving the Fixed Charge Transportation Problem by New Heuristic Approach [PDF]
The fixed charge transportation problem (FCTP) is a deployment of the classical transportation problem in which a fixed cost is incurred, independent of the amount transported, along with a variable cost that is proportional to the amount shipped.
Komeil Yousefi +2 more
doaj +1 more source
Combining hyper-heuristics to evolve ensembles of priority rules for on-line scheduling [PDF]
This research has been supported by the Spanish Government under research Project TIN2016-79190-R and by the Principality of Asturias under Grant IDI/2018/000176. Francisco J. Gil-Gala is supported by the scholarship FPI17/BES-2017-08203.
Francisco Javier Gil Gala +3 more
openaire +2 more sources
Long‐Term Follow‐Up of Chemotherapy‐Associated Biological Aging in Women With Early Breast Cancer
Women threated with adjuvant chemotherapy for early breast cancer have sustained long‐term increase in p16INK4a,, a robust marker of cell senescence, suggesting a chemotherapy‐associated age acceleration. p16INK4a as well as other biomarkers may identify patients at greatest risk for senescence‐related diseases of aging.
Hyman B. Muss +12 more
wiley +1 more source
An Optimal Flow Admission and Routing Control Policy for Resource Constrained Networks
Overloaded network devices are becoming an increasing problem especially in resource limited networks with the continuous and rapid increase of wireless devices and the huge volume of data generated.
Essia Hamouda
doaj +1 more source
H2RDC (heuristic handover based on RCC-DTSK-C), a heuristic algorithm based on a highly interpretable deep Takagi–Sugeno–Kang fuzzy classifier, is proposed for suppressing the mobile heterogeneous networks problem of frequent handover and handover ping ...
Fuqi Zhang, Pingping Xiao, Yujia Liu
doaj +1 more source
Setup‐Optimized Sequencing in Job Shops: Modeling Workstation Productivity and Lateness Behavior
Setup‐optimized sequencing in job‐shop production creates a trade‐off between productivity improvement and schedule reliability. A WIP‐explicit modeling framework links sequencing‐induced productivity gains and lateness dispersion through the production operating curve.
Friederike Stefanowski +2 more
wiley +1 more source

