Results 71 to 80 of about 24,541 (307)
On mine surveying and planning [PDF]
n ...
openaire +1 more source
Liquid biopsy‐based diagnostic evaluation of hypermethylated CpG sites for ovarian cancer diagnosis
This schematic outlines the workflow from biomarker identification to duplex MethyLight assay validation for epithelial ovarian cancer diagnosis using cfDNA‐based liquid biopsy. Initial screening of hypermethylated CpG candidates (cg02957270, cg10061138 cg00480298, COL2A1) was performed in tissue using ARMS‐PCR, COBRA, qPCR and image analysis. Selected
Deepa Bisht +3 more
wiley +1 more source
Strategies for automating open pit mine haulage planning
The traditional approach to open pit mine planning has consisted of an iterative process of economic modeling, pit limit determination, pushback design and production scheduling. Even though truck haulage costs typically account for one-third to one-half
Bush, Terry Alan
core
Gold ores often consist of nuggets associated with quartz veins. In other ore types gold can be found as a by-product to pyrite. For both types, mine planning of scattered veins type deposits is often complicated regarding both mine design and production
Hassan, Syed Alley, +7 more
core +1 more source
Improvements in Rock Mass Description for Stope Design by Geophysical and Geochemical Methods
Stope design is an important part of mine planning, and it aims to balance ore recovery, ore dilution, and production costs without compromising the safety aspects.
Mikael Rinne +7 more
doaj +1 more source
Patient‐derived organoids (PDOs) from pancreatic, colorectal, and gastric cancers were used to evaluate standard and experimental therapies. Incorporating cancer‐associated fibroblasts (CAFs) into organoid cultures improved patient therapy outcome prediction.
Marcin Grochowski +12 more
wiley +1 more source
Opportunities to incorporate mine closure into mine planning
Most early mine operations did not include closure planning. When closing an abandoned mine, operators are faced with all of the problems that have been left, for example, old equipment and structures, contamination, unstable landforms and a lack of soil
Ames, S. E.
core
Mine planning under uncertainty [PDF]
The aim of this study is to develop a methodology that can contribute to the construction of scenarios for mine planning and to evaluation of the impact of geological uncertainties provided by simulated models.
Capponi, Luciano Nunes +1 more
core
Incorporation of geological uncertainty in pit optimization with geostatistics simulation
Risk mapping processes in mine planning and ore recovery are constantly used in the mining industry to increase decision making certainty based on the available information. However, it is not possible to predict the risk behavior in all of the project's
Rafael Alvarenga Souza, Ivo Eyer Cabral
doaj +1 more source
The transition of coal-exhausted city (CEC) has been a worldwide problem, the transition planning of the CEC is a synergetic procedure. When we look into the transition problem of a larger CEC, the difficulties for the city planner come from the ...
Pingjia Luo, Yankai Miao, Jiang Chang
doaj +1 more source

